8000 Problem with the duration, which is always 1 · Issue #113 · pluginsGLPI/gantt · GitHub
[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to content
Problem with the duration, which is always 1 #113
Open
@jl-orq

Description

@jl-orq

Code of Conduct

  • I agree to follow this project's Code of Conduct

Is there an existing issue for this?

  • I have searched the existing issues

GLPI Version

10.0.17

Plugin version

gantt 1.1.0

Bug description

In project and/or global views, project duration is always displayed as 1 day.

Even if the next one has many days defined, the duration is always displayed as 1.

Image

Relevant log output

Page URL

No response

Steps To reproduce

No response

Your GLPI setup information

No response

Anything else?

No response

Metadata

Metadata

Assignees

No one assigned

    Labels

    bugSomething isn't working

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

      0