You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Hi, I'm trying to use this package, because it offers exactly what I need to manage longer projects, but I get really overwhelmed by the options and configuration.
By any chance could you provide a simpler example in the readme?
What I need is just to be able to see the period from where a task is started to its deadline, or multi-day schedules like SCHEDULED: <2024-11-10 dom>--<2024-11-15 sex>.
If its simpler, for me seeing ********** for the dates period is enough, instead of default that either show you start or end, but not both.
The text was updated successfully, but these errors were encountered:
Hi, I'm trying to use this package, because it offers exactly what I need to manage longer projects, but I get really overwhelmed by the options and configuration.
By any chance could you provide a simpler example in the readme?
What I need is just to be able to see the period from where a task is started to its deadline, or multi-day schedules like
SCHEDULED: <2024-11-10 dom>--<2024-11-15 sex>
.If its simpler, for me seeing
**********
for the dates period is enough, instead of default that either show you start or end, but not both.The text was updated successfully, but these errors were encountered: