8000 Wrong estimate for transit duration if long gaps are present · Issue #83 · hippke/tls · GitHub
[go: up one dir, main page]
More Web Proxy on the site http://driver.im/
Skip to content
Wrong estimate for transit duration if long gaps are present #83
Open
@hippke

Description

@hippke

e.g., when combining two TESS sectors with a long gap in between: Transit duration estimate is wrong.

Metadata

Metadata

Assignees

No one assigned

    Labels

    bugSomething isn't working

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions

      0