Closed
Description
Please confirm that the feature request does not already exist
- I confirm there is no existing issue for this feature request.
Use case
I have "Projects" and "Memos". I now want a Rollup field in the "Projects" table that shows me the date of the most recent memo, so I can quickly find projects that haven't seen activity in a while.
Suggested solution
Let me select the automatically created field "created time" and/or "last modified time" as a rollup relation
Additional context
At the moment it is not possible to use:
- the "created time" field
- the "last modified time" field
- a computed formula field ([Feature] Use Formula result in Rollup #3014)
as part of a rollup.
has:
- Last modified time (automatic)
- Formula (computed)
- Created (automatic)
- manual Date (manually created)
only shows
- manual Date
as an option for Rollup
Metadata
Metadata
Assignees
Type
Projects
Status
✅ Closed