[go: up one dir, main page]
More Web Proxy on the site http://driver.im/Jump to content

Grand Surrey Canal

From Wikipedia, the free encyclopedia

Grand Surrey Canal
The Norway Cut swing bridge crosses a channel from Greenland Dock to the closed Norway dock
Specifications
Maximum boat length109 ft 0 in (33.22 m)
Maximum boat beam18 ft 0 in (5.49 m)
Locks1
StatusClosed. Partly infilled.
History
Date of act1801
Date of first use1810
Date completed1826
Date closed1970s
Geography
Start pointCamberwell
End pointSurrey Commercial Docks, Rotherhithe
Connects toRiver Thames
Grand Surrey Canal
River Thames
Stave Dock
Russia Dock
Greenland Dock
Lock
South Dock
Plough Bridge
Deptford Wharf Branch
A200 Evelyn Street
SE&CR Main Line bridge
Necker Bridge
East London Railway bridge
Deptford Wharf Branch lift bridge
LB&SCR Main Line bridge
Croydon Canal
East London Railway bridge
South London line bridge
Canterbury Bridge
A2 Old Kent Road
Peckham Branch
Trafalgar Avenue
Hill Street Bridge
Commercial Way
Peckham Basin
Wells Way
Camberwell Basin

The Grand Surrey Canal was a canal constructed in south London, England during the early 19th century. It opened to the Old Kent Road in 1807, to Camberwell in 1810, and to Peckham in 1826. Its main purpose was to transport cargo, primarily timber (or 'deal') from the Surrey Commercial Docks.

The Grand Surrey Canal closed progressively from the 1940s, with all but the Greenland Dock closing in the 1970s. Much of the route is traceable, as it has been turned into roadways and linear parks.

History

[edit]

During the late 1700s, there were a number of proposals for canals on the south bank of the River Thames, and several of the prominent canal engineers of the time were involved. John Smeaton looked at two possible routes for a canal between Kingston upon Thames and Ewell in 1778. Ralph Dodd, who was also involved with promoting the Thames and Medway Canal, proposed a canal with a number of branches linking Deptford, Clapham, Kingston, Ewell, Epsom, Mitcham and Croydon. A plan for a canal from Croydon to Wandsworth was thought to be impractical by William Jessop and John Rennie, because the main source of water in the area through which it would run was the River Wandle, and this supplied a number of mills which would be affected if the river was used to supply the canal. Jessop also advised on a canal from Vauxhall to Rotherhithe in 1796, while in 1799, a railway from London through Croydon to Portsmouth, using horses to pull the wagons, was suggested. Eventually, three projects were submitted to parliament for approval. These were the Grand Surrey Canal, at the time called the Kent and Surrey Canal, the Croydon Canal linking Croydon and Rotherhithe, and the Surrey Iron Railway, a horse-drawn linking Croydon to Wandsworth, and all three were authorised in 1801.[1]

Grand Surrey Canal Act 1801
Act of Parliament
Long titleAn act for making and maintaining a navigable canal from the river Thames at or near a place called Wilkinson's Gun Wharf, in the parish of Saint Mary at Rotherhithe in the county of Surrey, to the town of Mitcham, in the parish of Mitcham, in the said county; and also divers collateral cuts or branches communicating from the same to certain parishes and places within the counties of Surrey and Kent.
Citation41 Geo. 3. (U.K.) c. xxxi
Dates
Royal assent21 May 1801

The Grand Surrey Canal was authorised by an act of Parliament, the Grand Surrey Canal Act 1801 (41 Geo. 3. (U.K.) c. xxxi) obtained on 21 May 1801, which created the Company of Proprietors of the Grand Surrey Canal, and gave them powers to raise £60,000 by issuing shares, and an additional £30,000 if required. They were authorised to build a canal from Rotherhithe, on the River Thames, to Mitcham in what was then Surrey, with branches to any places within 1,500 yards (1,400 m) of the main line.[2] Branches to Deptford, Peckham, the Borough, and one to rejoin the Thames at Vauxhall were included, but proposals for a branch from Mitcham to Croydon, and another to Kingston, which would have created a route to bypass the Thames through London, were removed from the bill during the committee stages. Those who opposed the canal ensured that clauses restricting use of water from the Wandle were inserted.[3]

Grand Surrey Canal on Mogg Pocket or Case Map of London, 1806

Work began on the canal, but at the same time, the London dock system was in its early stages of development, and there were proposals by John Hall in 1802 to construct a dock at Rotherhithe, close to the lock by which the canal gained access to the Thames. The canal company agreed to construct it in 1803, and although it was poorly funded, the 3-acre (1.2 ha) basin, together with a ship lock, was completed and opened on 13 March 1807. The Croydon Canal, which had also been authorised in 1801, proposed to join the Surrey Canal near Deptford, to save having to construct a parallel route to the Thames. The prospect of rent from this arrangement helped the company to open the first 3 miles (5 km) of the canal, as far as the Old Kent Road, in 1807, but their resolve to complete the canal had been lost, as the docks seemed a more lucrative prospect.[4]

Grand Surrey Canal Act 1807
Act of Parliament
Citation47 Geo. 3 Sess. 2. c. lxxx
Other legislation
Repealed byGrand Surrey Docks and Canal Act 1855
Status: Repealed
Grand Surrey Canal Act 1808
Act of Parliament
Long titleAn Act to enable the Company of Proprietors of the Grand Surrey Canal to supply with Water the several Towns, Districts, and Places therein mentioned, and to amend the several Acts relating to the said Canal.
Citation48 Geo. 3. c. xcix
Dates
Royal assent3 June 1808
Other legislation
Repealed byGrand Surrey Docks and Canal Act 1855
Status: Repealed
Text of statute as originally enacted
Grand Surrey Canal and Rotherhithe Branch Act 1811
Act of Parliament
Long titleAn Act to enable the Company of Proprietors of the Grand Surrey Canal to make a Collateral Cut, communicating therewith, in the Parish of Saint Mary Rotherhithe, in the County of Surrey, and to enable the said Company to complete the said Canal; and for amending the several Acts relating thereto.
Citation51 Geo. 3. c. clxx
Dates
Royal assent15 June 1811
Other legislation
Repealed bySurrey Commercial Dock Act 1864
Status: Repealed
Text of statute as originally enacted

However, a second act of Parliament, the Grand Surrey Canal Act 1807 (47 Geo. 3 Sess. 2. c. lxxx), authorised them to raise another £60,000, which was used to extend the canal to Memel Wharf and a basin at Camberwell. This work was completed in 1810. So far, the route had been level, but to go any further would have needed locks or inclined planes, and the expected costs of their construction did not inspire the company to proceed with them. A short branch of about 12 mile (0.80 km) was constructed in 1826, running from Glengall Wharf to Peckham Basin.[4] Two further acts of Parliament were obtained, the Grand Surrey Canal Act 1808 (48 Geo. 3. c. xcix) and the Grand Surrey Canal and Rotherhithe Branch Act 1811 (51 Geo. 3. c. clxx) to allow new funds to be committed to the project.[2]

Development

[edit]

In 1812, the canal was closed for two months while the company finished work on a new dock and connecting lock, which opened in November. Although no extensions to the canal other than the Peckham Branch were made, there was intermittent interest in such schemes. Some land was bought along the route of an extension from Camberwell to Kennington, which was considered in 1817, but was rejected because construction would require a deep cutting, restricting the amount of land available for wharves. The Peckham Branch, when it opened in May 1826, ended at a basin which was 450 by 80 feet (137 by 24 m), because of the demand for wharf space. When the London and Croydon Railway bill was passing through Parliament in 1835, which would result in the closure of the Croydon Canal, the Grand Surrey company managed to insert clauses into the bill to protect their canal against a low-level railway crossing, but failed to include a compensation clause for loss of trade from the Croydon Canal when it closed in 1838.[5]

The engineer Henry Price approached the company in 1835 with a grand scheme for branches from the canal to the Thames at Vauxhall and Deptford, which would provide a route which was some 2+12 miles (4 km) shorter than the river route between Vauxhall and Rotherhithe. The scheme also included a railway along the bank of the canal from Vauxhall to Deptford, with a branch to Elephant and Castle. A prospectus was issued for the Grand Surrey Dock, Canal and Junction Railway Company, but there was little interest in subscribing the £600,000 capital needed, and the scheme foundered. Another scheme in 1850 was for a canal to the Kennet and Avon Canal at Reading, with branches to the Thames at Maidenhead, Datchet, Staines, Richmond, Mortlake, Wandsworth and Vauxhall. The route would have reduced the distance between Reading and Deptford from 42 miles (68 km) to 22 miles (35 km), but it seems unlikely that the estimated cost of only £500,000 was realistic.[6]

The Rotherhithe end of the canal saw many changes, as the docks developed. As first built, the canal ended at the Stave Dock, which was connected to the Thames by a lock. This was replaced by a new lock in 1860, built to the west of the original, which linked the Thames to a triangular basin, known as the Surrey Basin, which was itself linked to Island Dock and Albion Dock. Island Dock led into Russia dock, where the canal had an entrance lock. The Commercial Dock Company built a number of docks to the east, and the rivalry between the two companies ended in 1864, when they amalgamated and the complex became part of the Surrey Commercial Docks.[7] The canal entrance lock was swept away in 1904, when the Greenland Dock was extended, and a new entrance lock was built on its south side. By this time, nearly 1 mile (1.6 km) of the original canal had been destroyed by dock construction.[8]

Grand Surrey Canal on Davies Pocket Map of London, 1852

During the second half of the 19th century, the canal was used by the South Metropolitan Gas Company to supply coal using its own fleet of tugs and barges to its gas works site on the Old Kent Road. The canal was also heavily used to move timber.[8] Tolls for use of the canal were collected at four toll-houses, which were situated near Wells Street bridge in Camberwell, by the junction with the Peckham Branch, by the junction with the Croydon Canal, and at the junction with Greenland Dock. At each there was a gate across the towpath, which prevented progress until a toll had been paid. The gate was known as a "hatch", from the word for a gate or sluice, and the toll-houses were also called hatches by association.[9] The canal was never very profitable, as stiff competition between the London dock companies kept toll rates low. A first dividend of 2 per cent was paid in 1819, which increased to 3 per cent the following year, but remained at or below this figure for the life of the canal.[10]

Below the junction with the Croydon Canal, a railway bridge was built for the Deptford Wharf branch, which was authorised by the London and Croydon Railway Act 1846 (9 & 10 Vict. c. ccxxxiv). In 1854, the London, Brighton and South Coast Railway gained an act, the London, Brighton and South Coast Railway Act 1854 (17 & 18 Vict. c. lxi), and the Deptford Wharf Branch was re-routed over the canal at a lower level. The canal company campaigned for a swing bridge to be built, but the Railway Commissioners overruled their objections, and a vertical lifting bridge was installed. This was 13 feet (4.0 m) wide and 31+12 feet (9.6 m) long, and provided 9+12 feet (2.9 m) of headroom when it was raised. Operation was initially manual, but electric motors were later installed, and it continued to operate until the branch was lifted in 1964.[9]

The Grand Surrey Canal was the first to have canal police (forerunners of the British Transport Police). "Bank rangers" were appointed in 1811 to keep law and order along the length of the canal.[11]

Demise

[edit]

London's docks were rationalised in 1908, with the formation of the Port of London Authority. The canal was managed as part of Surrey Docks, and although there were few changes to its operation, it became known as the Surrey Canal.[12] Despite the large number of railway bridges which crossed it, the railways were not in direct competition with the canal. There was a railway interchange on the remains of the Croydon Canal, and South Dock was served by the Deptford Branch railway, but neither offered a real threat, and the canal continued to thrive until the expansion of road transport after the end of the Second World War in 1945.[7] The Camberwell basin and the final 500 yards (460 m) of the canal were abandoned in the 1940s, and had been filled in by 1960. The timber trade to the docks ceased in the early 1970s, resulting in the docks closing, and the canal being filled in.[12]

Present day

[edit]

The section of canal between South Bermondsey and Deptford was opened as a vehicular road and renamed Surrey Canal Road in the 1980s, linking Ilderton Road with Trundleys Road. Where the canal crossed Trundleys Road and proceeded towards the Evelyn Street and the docks was utilised as a private access road called Canal Approach to serve the warehouses and industrial sites that still existed along the top end of the canal's route. The former canal side offices and buildings opposite Deptford Park on Grinstead Road were largely demolished and replaced by a modern Barratt development of flats called Inwen Court. Part of the route within the London Borough of Lewisham is now the Surrey Canal Linear Park, construction of which was funded by money from nearby housing developments at Cannon and Marine Wharf and Deptford Wharves.[13]

The former Camberwell Basin and the final 0.9 miles (1.4 km) now form part of the site of Burgess Park.[14] The bridge over the canal which was built in 1906, remains as a feature in Burgess Park, and is now known as the Bridge to Nowhere.[15] Most of the Peckham branch, including its bridges and walls, is now a walking and cycling route, known both as the Surrey Canal Walk[16] and Surrey Canal Linear Path (not to be confused with Lewisham's Surrey Canal Linear Park).[17] Peckham Library has been built over the terminal basin.[18] The Greenland Dock remains in water, and is connected to the South Dock, now a marina, which gives access to the River Thames through a lock.

21st century

[edit]

See New Bermondsey railway station#Development in the local area.

Points of interest

[edit]

See also

[edit]

References

[edit]
  1. ^ Hadfield 1969, p. 102
  2. ^ a b Priestley 1831, pp. 312–313
  3. ^ Hadfield 1969, p. 103
  4. ^ a b Parkhouse & Pope 1994, p. 15
  5. ^ Hadfield 1969, pp. 104–106
  6. ^ Hadfield 1969, pp. 106–107
  7. ^ a b Parkhouse & Pope 1994, p. 17
  8. ^ a b Parkhouse & Pope 1994, p. 21
  9. ^ a b Parkhouse & Pope 1994, p. 19
  10. ^ Hadfield 1969, pp. 107–108
  11. ^ "Canal Police Forces". BTP History Society. Archived from the original on 29 September 2006. Retrieved 11 April 2006.
  12. ^ a b Parkhouse & Pope 1994, p. 26
  13. ^ "Surrey Canal Linear Park". Lewisham Council. Archived from the original on 22 September 2020. Retrieved 6 December 2020.
  14. ^ "Grand Surrey Canal: Burgess Park - Canal terminus". London Canals. Archived from the original on 1 June 2010.
  15. ^ "Bridge to Nowhere". Friends of Burgess Park. Archived from the original on 8 August 2020. Retrieved 6 December 2020.
  16. ^ "Southwark Council Burgess Park Masterplan 2015". Retrieved 6 December 2020.
  17. ^ "Bermondsey to Peckham Quietway Consultation". Southwark Council. Archived from the original on 17 February 2021. Retrieved 6 December 2020.
  18. ^ "Grand Surrey Canal: Peckham Branch". London Canals. Archived from the original on 1 June 2010.

Bibliography

[edit]
[edit]