[go: up one dir, main page]
More Web Proxy on the site http://driver.im/Jump to content

Carquinez Bridge

Coordinates: 38°03′39″N 122°13′33″W / 38.0608°N 122.2257°W / 38.0608; -122.2257
From Wikipedia, the free encyclopedia
Carquinez Bridge
The Carquinez Bridge in 2022: (from closest to furthest) a 2003 suspension bridge and the 1958 cantilever bridge
Coordinates38°03′39″N 122°13′33″W / 38.0608°N 122.2257°W / 38.0608; -122.2257
Carries
  • 8 lanes of I-80
  • Bicycles and pedestrians on westbound span
CrossesCarquinez Strait
LocaleCrockett and Vallejo, California, U.S.
Official nameAlfred Zampa Memorial Bridge (suspension bridge only)
Other name(s)Zampa Bridge, Vallejo Bridge
OwnerState of California
Maintained byCalifornia Department of Transportation and the Bay Area Toll Authority
ID number23 0015L (1927 span)
23 0015R (1958 span)
28 0352L (2003 span)
Websitewww.bayareafastrak.org
Characteristics
DesignCantilever bridge (eastbound)
Suspension bridge (westbound)
Total length3,465 feet (1,056 m) or 0.66 miles (1.06 km) (suspension bridge), 3,300 feet (1,000 m) (cantilever bridge)
Width84 feet (26 m) (suspension deck), 52 feet (16 m) (cantilever deck)
Height410 feet (120 m) (suspension tower)
Longest span2,387 feet (728 m) (suspension span)
Clearance below148 feet (45 m) (suspension bridge), 140 feet (43 m) (cantilever bridge)
History
OpenedMay 21, 1927; 97 years ago (1927-05-21) (original span)
November 25, 1958; 66 years ago (1958-11-25) (eastbound)
November 11, 2003; 21 years ago (2003-11-11) (westbound)
ClosedSeptember 4, 2007 (2007-Sep-04) (original span)
Statistics
Toll
  • Eastbound only
  • FasTrak or pay-by-plate, cash not accepted
  • Effective January 1, 2022 – December 31, 2024 (2022-01-01 – 2024-12-31):
  • $7.00
  • $3.50 (carpool rush hours, FasTrak only)
Location
Map

The Carquinez Bridge is a pair of parallel bridges spanning the Carquinez Strait at the northeastern end of San Francisco Bay. They form the part of Interstate 80 between Crockett and Vallejo, California, United States.

The name Carquinez Bridge originally referred to a single cantilever bridge built in 1927, which was part of the direct route between San Francisco and Sacramento. A second parallel cantilever bridge was completed in 1958 to deal with the increased traffic.

Later, seismic problems made the 1927 span unsafe in case of an earthquake, and led to the construction, and 2003 opening, of a replacement: a suspension bridge officially named the Alfred Zampa Memorial Bridge, in memory of iron worker Al Zampa, who played an integral role in the construction of numerous San Francisco Bay Area bridges. The Alfred Zampa Memorial Bridge carries southbound traffic from Vallejo to Crockett, and the 1958 cantilever span carries northbound traffic.

History and description

[edit]

The first regular crossing of the Carquinez Strait began in the mid-1800s as a ferry operated between the cities of Benicia and Martinez, six miles upstream from the bridge site. Auto service started on this route in 1913. A train ferry operated between Benicia and Port Costa from 1879 until 1930 when a rail bridge opened. Ferry service at the site of the bridge started in 1913 by the Rodeo-Vallejo Ferry Company.[1]

Original span (1927–2007)

[edit]

The original steel cantilever bridge was designed by Robinson & Steinman and dedicated on May 21, 1927. Prior to this, crossing the Carquinez Strait necessitated the use of ferries. The bridge cost $8 million to build. It was the first major crossing of the San Francisco Bay[2] and a significant technological achievement in its time.

Upon its completion, the span became part of the Lincoln Highway. This historic transcontinental roadway's original alignment, like the Transcontinental Railroad that preceded it nearly sixty years earlier, chose to avoid crossing the Carquinez Strait entirely. The preferred option, given the engineering limitations of the day, was to skirt around the Delta by going south from Sacramento through Stockton, then proceeding west across the San Joaquin River and over the Altamont Pass, and finally reaching Oakland from the south; a route that would later become U.S. Route 50 and ultimately Interstates 5, 205, and 580. This circuitous route, several miles longer, and traversing a rather formidable mountain pass, was preferable to crossing the Carquinez Strait, a deep channel with strong currents and frequent high winds. For decades, building a bridge across the Carquinez Strait was considered prohibitively expensive and technologically risky. Once the bridge was built however, driving from Sacramento to the East Bay became much more direct. The Carquinez Bridge provided a welcome alternative route from the Central Valley to the Bay Area, one that no longer required loading one's vehicle onto and off of a ferry. With the bridge completed, the Lincoln Highway was realigned to cross the Sacramento River, then proceed southwest through Davis and Vallejo, across the Carquinez Bridge, and along the shores of the San Pablo and San Francisco bays to Richmond and Oakland; becoming U.S. Route 40, and ultimately Interstate 80.

After the Loma Prieta earthquake engineers determined that the aging 1927 span was seismically unstable, and that a retrofit was impossible. The decision was made to replace it with a new suspension bridge. The 1927 span was temporarily used to hold eastbound traffic while the 1958 eastbound span underwent a seismic retrofit, deck and superstructure rehabilitation, and painting to extend its serviceable life.[3] The old 1927 cantilever bridge was dismantled three years after the opening of its replacement; with completion on September 4, 2007. A 3,000-pound bronze bell atop one of the bridge piers was removed and placed into storage. The bell will eventually be displayed in a new museum to be built at the Oakland end of the San Francisco–Oakland Bay Bridge.

Parallel span (1958)

[edit]

At a cost of $38 million[4] a parallel bridge was built just east of the 1927 bridge. The new bridge carried all traffic for a few months after it opened in November 1958, then after new ramps were built, the three-lane 1927 span, originally two-way, served westbound traffic while the four-lane 1958 span handled eastbound traffic.

Alfred Zampa Memorial Bridge (2003 replacement span)

[edit]

At a cost of $240 million a new suspension bridge was built, to the west of the two earlier bridges, by the joint venture consisting of Flatiron Structures of Longmont, Colorado, FCI Constructors of Benicia, California, and the Cleveland Bridge & Engineering Company of Darlington, England.[4][5]

This new bridge was named the Alfred Zampa Memorial Bridge, after an ironworker who worked on a number of the San Francisco Bay Area bridges, including the Golden Gate Bridge, and the original 1927 Carquinez span. The bridge was dedicated on November 8, 2003, and opened for traffic on November 11, 2003. Originally, the plan was to dedicate the bridge on November 15, but complications involving then just-recalled Governor Gray Davis and the transfer of power to Arnold Schwarzenegger resulted in the date being moved. The coins minted to commemorate the event have the original date on them.[6]

The new suspension bridge, consists of the south anchorage, a transition pier, the South and North towers, and the north anchorage. It has spans of 147 m, 728 m, and 181 m. for a total span of 0.66 miles (1,060 m). It features a pedestrian and bicycle path, part of a bike trail which it is hoped will eventually circle the entire Bay Area. The towers are each founded on two footings, which are each supported by six vertical, 3-metre-diameter (9.8 ft) steel shells infilled with reinforced concrete, followed by 2.7-metre-diameter (8.9 ft) drilled shafts in rock, i.e., cast-in-drilled hole, or CIDH, piles. The total length of the CIDH pile at the South Tower is approximately 89 m, with about 43 m of drilled shaft in rock. The total length of the CIDH pile at the North Tower ranges from 49 to 64 m, with about 16 to 26 m of drilled shaft in rock. The design parameters used for the South Tower piles were later confirmed by a pile load test. Additional field investigations during construction revealed significant variations in rock conditions at the North Tower, resulting in the redesign of the length of the piles. Major construction challenges encountered during construction of the South Tower piles, and the revised construction procedure, i.e., under-reaming, used by the constructor to mitigate caving.

Materials for the New Bridge came from all over the world:

  • Steel Caissons for CIDH: XKT Engineering – Vallejo, California
  • Orthotropic Deck Sections: IHI – Japan
  • Tower and Splay Saddles:
    • Castings: Sheffield Steel – England
    • Finishing and Machining: Kvaerner – England
  • Main Cable Wire: Bridon – England
  • Wire for Cable Wrapping: Canada
  • Cable Bands: France
  • Suspenders (Hardware, Casting, Fabrication): WRCA – St. Joseph, Missouri
  • (3) Maintenance Travelers Under Deck Sections: Jesse Engineering – Tacoma, Washington

Tolls

[edit]

Tolls are collected only from automotive traffic headed eastbound, towards Vallejo at the toll plaza on the north side of the bridge. Although the 2003 Alfred Zampa Memorial Bridge is the newer span, no toll is charged in that direction, continuing the practice of the now-demolished 1927 span. All-electronic tolling has been in effect since 2020, and drivers may either pay using the FasTrak electronic toll collection device, using the license plate tolling program, or via a one time payment online. Effective January 1, 2022 – December 31, 2024 (2022-01-01 – 2024-12-31), the toll rate for passenger cars is $7. During peak traffic hours, carpool vehicles carrying three or more people, clean air vehicles, or motorcycles may pay a discounted toll of $3.50 if they have FasTrak and use the designated carpool lane. Drivers must pay within 48 hours after crossing the bridge or they will be sent a toll violation invoice. No additional fees will be added to the toll violation if it is paid within 21 days.[7]

Historical toll rates

[edit]

Crossing the original 1927 bridge required a toll, but tolls were removed soon after the state bought the bridge in 1940. Tolls in 1926 were originally set at $0.60 per car plus $0.10 per passenger. This was reduced in 1938 to $0.45 per car plus $0.05 per passenger. After the state took ownership, tolls were immediately reduced to $0.30 per car. In 1942, tolls were further reduced to $0.25 before being removed in 1945. Tolls were reinstated in 1958 with the completion of the parallel span, set again at $0.25. It was increased to $0.35 in 1970, and then $0.40 in 1978.[8]

The basic toll (for automobiles) on the seven state-owned bridges, including the Carquinez Bridge, was raised to $1 by Regional Measure 1, approved by Bay Area voters in 1988.[9] A $1 seismic retrofit surcharge was added in 1998 by the state legislature, originally for eight years, but since then extended to December 2037 (AB1171, October 2001).[10] On March 2, 2004, voters approved Regional Measure 2, raising the toll by another dollar to a total of $3. An additional dollar was added to the toll starting January 1, 2007, to cover cost overruns concerning the replacement of the eastern span.

The Metropolitan Transportation Commission, a regional transportation agency, in its capacity as the Bay Area Toll Authority, administers RM1 and RM2 funds, a significant portion of which are allocated to public transit capital improvements and operating subsidies in the transportation corridors served by the bridges. Caltrans administers the "second dollar" seismic surcharge, and receives some of the MTC-administered funds to perform other maintenance work on the bridges. The Bay Area Toll Authority is made up of appointed officials put in place by various city and county governments, and is not subject to direct voter oversight.[11]

Due to further funding shortages for seismic retrofit projects, the Bay Area Toll Authority again raised tolls on all seven of the state-owned bridges in July 2010. The toll rate for autos on the Carquinez Bridge was thus increased to $5.[12]

In June 2018, Bay Area voters approved Regional Measure 3 to further raise the tolls on all seven of the state-owned bridges to fund $4.5 billion worth of transportation improvements in the area.[13][14] Under the passed measure, the toll rate for autos on the Carquinez Bridge will be increased to $6 on January 1, 2019; to $7 on January 1, 2022; and then to $8 on January 1, 2025.[15]

In September 2019, the MTC approved a $4 million plan to eliminate toll takers and convert all seven of the state-owned bridges to all-electronic tolling, citing that 80 percent of drivers are now using FasTrak and the change would improve traffic flow.[16] On March 20, 2020, accelerated by the COVID-19 pandemic, all-electronic tolling was placed in effect for all seven state-owned toll bridges.[17] The MTC then installed new systems at all seven bridges to make them permanently cashless by the start of 2021.[18] In April 2022, the Bay Area Toll Authority announced plans to remove all remaining unused toll booths and create an open-road tolling system which functions at highway speeds.[19]

[edit]
  • The 1927 span of the Carquinez Bridge is featured on a Season 4 episode of MythBusters in the Miniature Earthquake Machine segment. This experiment, based upon a claim by inventor Nikola Tesla that his mechanical oscillator produced an earthquake in 1898, employed a small tunable reciprocating mass driver to shake the bridge at its resonance frequency. While not structurally significant, the shaking was felt some distance from the driver.
  • An hour-length program, titled Break It Down: "Bridge", documenting the demolition of the 1927 bridge aired on National Geographic Channel, on November 1, 2007
  • On October 5, 2007, a man jumped off the new 156-foot-high (48 m) bridge. The Coast Guard, Vallejo Police, and Fire responded to find him on the breakwater. He survived the fall.
  • Four books have been published about, or featuring, the Carquinez Bridges:Spanning the Carquinez Strait: The Alfred Zampa Memorial Bridge (2003) by Caltrans, and Spanning the Strait: Building the Alfred Zampa Memorial Bridge (2004), Al Zampa and the Bay Area Bridges (2005), and, most recently, Carquinez Bridge: 1927-2007 (2017) all by John V. Robinson.

See also

[edit]

References

[edit]
  1. ^ "Toll Tags - FAQs - FasTrak". www.bayareafastrak.org. Retrieved 2021-07-29.
  2. ^ The Barrier Broken – Vallejo Evening Chronicle, May 21, 1927
  3. ^ "Old Carquinez Bridge is disappearing" – San Francisco Chronicle, April 25, 2006.
  4. ^ a b "Bay Area Toll Authority – Bridge Facts – Carquinez Bridge". Bata.mtc.ca.gov. 2011-01-27. Archived from the original on 2011-08-09. Retrieved 2011-08-21.
  5. ^ "Cleveland Bridge nets US suspension bridge". New Civil Engineer. 20 January 2000. Retrieved 18 September 2021.
  6. ^ "Alfred Zampa memorial coins"[full citation needed] Archived October 7, 2007, at the Wayback Machine – Official website
  7. ^ "Carquinez Bridge". www.bayareafastrak.org. Caltrans. Retrieved July 10, 2022.
  8. ^ "History of California's Bridge Tolls" (PDF). Caltrans. Retrieved June 3, 2018.
  9. ^ Regional Measure 1 Toll Bridge Program. bata.mtc.ca.gov; Bay Area Toll Authority. Archived November 4, 2010, at the Wayback Machine
  10. ^ Dutra, John (October 14, 2001). "AB 1171 Assembly Bill – Chaptered". California State Assembly. Archived from the original on March 15, 2012. Retrieved August 7, 2008.
  11. ^ "About MTC". Metropolitan Transportation Commission. October 15, 2009. Archived from the original on November 3, 2010. Retrieved October 15, 2009.
  12. ^ "Frequently Asked Toll Questions". Bay Area Toll Authority. June 1, 2010. Archived from the original on November 22, 2010. Retrieved June 29, 2010.
  13. ^ Cabanatuan, Michael (June 6, 2018). "Regional Measure 3: Work on transportation improvements could start next year". SFGate.com.
  14. ^ Kafton, Christien (November 28, 2018). "Bay Area bridge tolls to increase one dollar in January, except Golden Gate". KTVU.
  15. ^ "Tolls on Seven Bay Area Bridges Set to Rise Next Month" (Press release). Metropolitan Transportation Commission. December 11, 2018. Retrieved December 16, 2018.
  16. ^ Smith, Darrell (September 7, 2019). "Do you drive to the Bay Area? A big change is coming to toll booths at the bridges". The Sacramento Bee. Retrieved April 12, 2020.
  17. ^ "Cash Toll Collection Suspended at Bay Area Bridges". Metropolitan Transportation Commission. March 20, 2020. Retrieved March 20, 2020.
  18. ^ "New Year Brings New Toll Collection System to Bay Area Bridges". Metropolitan Transportation Commission. December 28, 2020. Retrieved December 28, 2020.
  19. ^ Cabanatuan, Michael (10 April 2022). "Bay Area toll collectors are gone, so what happens to the tollbooths? Here's the $77 million answer". San Francisco Chronicle. Retrieved 12 April 2022.
  20. ^ "California Rework - Road Network #1". Prague: SCS Software. February 2022.
[edit]