Abstract
High performance computing continues to reach higher levels of performance and will do so over the next 10 years. However, the costs of operating such large scale systems are also growing. This is mainly due to the fact that the power consumption has increased over time and keeps growing. While a top 10 system 15 years ago would be in the range of 100 KW the most recent list shows systems in the range of 1- 2 MW and more. This factor of 10 makes costs for power and cooling a significant issue. The second financial issue is the increase in investment cost for such systems.
Access this chapter
Tax calculation will be finalised at checkout
Purchases are for personal use only
Preview
Unable to display preview. Download preview PDF.
Similar content being viewed by others
Author information
Authors and Affiliations
Editor information
Editors and Affiliations
Rights and permissions
Copyright information
© 2011 Springer-Verlag Berlin Heidelberg
About this paper
Cite this paper
Resch, M. (2011). Experience of a PRACE Center. In: Cotronis, Y., Danalis, A., Nikolopoulos, D.S., Dongarra, J. (eds) Recent Advances in the Message Passing Interface. EuroMPI 2011. Lecture Notes in Computer Science, vol 6960. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-24449-0_1
Download citation
DOI: https://doi.org/10.1007/978-3-642-24449-0_1
Publisher Name: Springer, Berlin, Heidelberg
Print ISBN: 978-3-642-24448-3
Online ISBN: 978-3-642-24449-0
eBook Packages: Computer ScienceComputer Science (R0)