default search action
"Scheduling of design projects with uncertain number of iterations."
Peter B. Luh, Feng Liu, Bryan R. Moser (1999)
- Peter B. Luh, Feng Liu, Bryan R. Moser:
Scheduling of design projects with uncertain number of iterations. Eur. J. Oper. Res. 113(3): 575-592 (1999)
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.